Skip to Main Content
Facilities and Capital Projects

Pioneer Middle School Gymnasium: $8.4 million 

Pioneer Middle School was remodeled in 2005, but the gym was left unchanged from its original construction in 1956. Construction is modernizing the gymnasium, address interior and exterior safety and infrastructure improvements, which includes new outdoor grandstands. 

  • Modernize locker rooms, the stage, and the lobby.
  • Modernize grandstands on north side.
  • Bring all facility up to current code for safety, ADA, earthquake.
  • Update gymnasium electrical system.
  • Upgrade mechanical systems, including plumbing and ventilation.
  • Remove old steam broilers and replace with storage space.
  • Rebuild grandstands and supporting slab which serves as the locker room roof and ceiling.
  • Improve building security.
  • Reduce utility costs (electrical, water and sewer).
  • Better serve the public and for extra curricular events.

Upcoming Events

April 1

Spring Break (No School)

Start: Apr 1, 2024 End: Apr 5, 2024

Multi-Day Event

April 9

Board Meeting

6:00 PM

April 15

Board Workshop

1:00 PM

This site provides information using PDF, visit this link to download the Adobe Acrobat Reader DC software.